Saddleback High School

Santa Ana Unified School District
$14.2 Million

This full campus modernization project included reconfiguration and renovation of the existing Classroom Building to increase classroom sizes, add smart board technology and new computer labs. The existing Theater Arts Building was renovated/reconfigured from an in-the-round configuration into a more traditional house/stage/backstage black box theater. New bleachers were installed in the Gym, the library area was redesigned and renovated, the electrical system was upgraded including fire alarm and lighting, and all buildings were made ADA accessible. This project also included installation of brand new $2.5 million all-weather synthetic track and field.